Business Suits / Corporate Programs

Tailored Business Suits for Corporate Identity

We build suiting programs for consistency, not runway drama. The brief is simple: clean fit, durable shape retention, and predictable quality across every size in the run.

Quick answer

MOQ
MOQ and production lead time are confirmed per project after style, fabric, construction, quantity, and schedule review
Lead time
20–MOQ and production lead time are confirmed per project after style, fabric, construction, quantity, and schedule review
Core fabrics
Pure wool / poly-wool / TR / stretch wool
Customizable
Fit, lining, buttons, front construction, branding

Suit Fabrics With Clear Cost Bands

FabricCompositionSeasonPositioning
Pure WoolSuper 100s-150sAutumn/WinterPremium
Poly-WoolWool / polyesterYear-roundBest balance
TR FabricPoly / rayonYear-roundValue tier
Stretch WoolWool with elastaneYear-roundPerformance premium

Program Formats

Two-piece suits for core teams
Three-piece executive sets
Separate blazer programs
Mixed fit blocks by department

Minimum order quantity starts at 50 sets per style. Sample runs of 2 to 3 sets are available before bulk commitment.

Why Procurement Teams Choose This Program

  • Repeatable fit standards across branches and reorders.
  • Durable linings, seams, and button attachment for heavy office use.
  • Clear price ladder based on fabric and construction level.
  • Single factory control from cutting to final inspection.

Suit Project Gallery

Need a suiting range that feels premium without becoming fragile?

We can recommend the right cloth mix for climate, budget, and presentation goals.

Request a Suit Quote

Frequently Asked Questions

MOQ and production lead time are confirmed per project after style, fabric, construction, quantity, and schedule review. We usually make 2–3 sample sets to confirm fabric and fit before bulk production.

Yes. We lock the master sample, color card, and size matrix so reorders stay stable across batches and locations.

Pure wool, poly-wool blends, TR, and stretch wool — matched to budget, climate, and wear frequency.

Standard lead time is 20–MOQ and production lead time are confirmed per project after style, fabric, construction, quantity, and schedule review, including lining, buttons, and front-construction detailing.

WhatsApp